MEP Contractor Dubai — Electrical, Plumbing, HVAC & Finishing Packages for New Builds
Your structure is up — we deliver the works packages that make it a home. Priced from your drawings, delivered on milestones.
- 01
Visit
- 02
Fixed BOQ
48h
- 03
Milestones
Six packages, each priced on its own BOQ
Electrical
First fix through second fix: conduit and back-box layout, DB position and sizing, wiring pulled to the drawing, then sockets, switches, lighting points and final terminations. Delivered ready for DEWA connection, with the circuit schedule labelled at the board rather than left for someone to work out later.
Plumbing & drainage
As the plumbing contractor on a new build we take the supply rough-in in hot and cold, soil and waste drainage set to fall, water heater positions and connections, tank and pump connections, then sanitary-ware installation and commissioning. Pressure-tested before anything is closed up, because a joint behind a wall is not a joint you want to revisit.
HVAC
Duct routes and sizing, indoor and outdoor unit installation, condensate drainage with correct falls and traps, grilles balanced across rooms, and fresh-air provision where the design calls for it. Commissioned and airflow-checked as part of the package rather than as an extra.
Tiling & flooring
Screed and levelling, waterproofing to wet areas with a recorded flood test, then setting out and laying so cuts land where they are least visible. Movement joints on large areas and at thresholds, skirting cut and closed, grouted and sealed.
Paint & finishes
Plaster and making good, filling and sanding, priming and sealing, then topcoats in the sheen you specify. Interior and exterior, with masonry coatings rated for UV and Gulf humidity. The preparation is a priced line, not an assumption.
Gypsum & ceilings
Suspended ceilings and bulkheads, partition framing and boarding, access panels where services need reaching, cornices and shadow gaps. Set out to coordinate with lighting, sprinklers and air distribution before anything closes.
Priced from your drawings, not from a walk-round
A works package is measurable, so it is quoted from the approved drawings rather than estimated on site. That means you can compare our number against another contractor’s line for line, and it means the price does not move when someone re-measures.
- You send the approved drawings and the specification for the package you want
- We measure the quantities and return a package BOQ — item, quantity, rate, total
- The milestone schedule is aligned with your site progress, not with our calendar
- We sequence with your main contractor so the package lands when the structure is ready
The parts that decide the programme
Authority-inspection readiness
Electrical work has to satisfy DEWA at connection, and Civil Defense signs off detection, sprinklers and escape provisions where the building type requires it. We build to the inspection standard from first fix, because remediation after a failed inspection costs more than doing it once.
Coordination with the main contractor and consultant
On a live site the package has to fit someone else’s programme. We work to the consultant’s drawings and the main contractor’s sequence, attend coordination where it is called, and flag a clash on paper rather than discovering it in the slab.
Snag-free handover per package
Each package is inspected and snagged on its own rather than rolled into a single handover at the end. You raise the list, we close every item, and the package milestone is released once it is empty — the same retention structure as any other project.
Money follows finished work
Payment milestones
- 30–40%
- Materials & mobilisation
- 30%
- Midway milestone
- 20%
- On completion
You hold the last 10% until every snag is closed.
Milestones are written into the BOQ contract.
Before you send drawings
Can we take one package, or do we have to take all of them?
One is fine. Each package is priced and delivered on its own BOQ and its own milestones, so taking the electrical package alone is a normal way to work with us. Taking several does reduce the coordination you have to do yourself.
Do you work from consultant drawings?
Yes, and we prefer to. Approved drawings and a specification let us measure quantities and give a package BOQ you can compare line for line against another contractor. Where the drawings are incomplete we say which information is missing rather than pricing around the gap.
If an authority inspection fails, who fixes it?
We do, at our cost, where the failure is in our workmanship or our compliance. Where it fails because of a design decision or another trade’s work, we tell you plainly which it is and quote the remedy separately rather than absorbing someone else’s problem into your bill.
How long does a package take?
For a standard villa, electrical first fix is commonly one to two weeks and second fix similar; plumbing rough-in runs alongside; finishing packages depend entirely on area. Every package BOQ carries its own programme, and it is sequenced against your site rather than quoted in isolation.
Building new? Send your drawings for a package BOQ